This weather forecast page is the one examined by Lieselotte Jochum in charge of the MATISSE logistics at ESO. pdfPDF

 

meteo Paranal 17 Novembre 2017

Tommorow, Friday the 17th of November, the Warm Optics subsystem of MATISSE with its associated electronic cabinet and its related equipment for its intallation will be transported from the VLT basecamp to the
Paranal submit. Rain and/or wind are prohibited for the transport itself and for the opening of the hatch allowing the lifting of the equipment down to the floor of the VLTI focal lab.